Ch 9: Level 1: The Production Floor
Overview
This chapter explores Level 1. It is a critical component of the Agora system.
The Cloud Kitchen Array
(Drafting in progress…)
Detailed analysis of the cloud kitchen array will be expanded here.
Multi-Cuisine Station Design
(Drafting in progress…)
Detailed analysis of multi-cuisine station design will be expanded here.
The Central Pass (Expediting Area)
(Drafting in progress…)
Detailed analysis of the central pass (expediting area) will be expanded here.
Utility Infrastructure: Exhaust & Power
(Drafting in progress…)
Detailed analysis of utility infrastructure: exhaust & power will be expanded here.